Technical Description |
|
Location | Barangay Talavera, Toledo City, Cebu Province |
Service Contract |
Citicore Solar Toledo 60 MW Solar Power Generation (for 25 Years) |
Grid | Visayas |
Transmission Line | c.420 m; 69 kV |
Installed Capacity | 60.0 MWdc |
Inverter |
Schneider Electric 550 - 800V DC – 380V AC, 1040A 72 Inverters |
COD | 30 June 2016 |
Design Life | 30 years |
EPC Contractor(s) | MCC |
O&M Contractor(s) | CPI |
Grid Connections | Connection point to the NGCP grid through the 69 kV Calulng-Calulng substation |
PV Module Description |
|
No. of modules | 193,440 |
Manufacturer | BYD and Renesola |
Model | 310 |
Cell Type | Polycrystalline Silicon |
Peak Power Output | 310Wp |
Module Efficiency | 15.98/16.00% |
Power Tolerance | 0/+5Wp |
Temp Coefficient | -0.43% and -0.4%/°C |
- Each PV table is designed to have 2 rows of 20 PV modules each with 2.0 m row-to-row distance to enhance efficiency of the overall PV array
- Tier 1 rated and internally accredited and approved PV module suppliers were chosen based on bankability, warranty and availability of modules